21-10-2008
New projects have been recently added to
our database and are open for participation...
21-10-2008
A wide range of new data packages are now available on many of our prospects. Contact us to learn more...
Working hand in hand
with the energy
industry to help the
disadvantaged
 

New

Oman

Project 1-

Cluster of four discoveries on the boarder of open concession area

Small discovery with 2.5 MMBO 20 gravity completed in the Al Khlanta Formation at 1500m.

Small discovery with 2.5 MMBO 22 gravity completed in the Amin Formation at 1400m.

Two discoveries with 5 MMBO, 17 gravity from the Gharif formation at 877m.

Heavy oil discovery (13.5 API), with 35MMBO in the Al Khlata Formation at 1200m

 
Syria
 
Project 1- Partially developed field, one discovery well and two successful appraisal wells. 20 MMBO proven recoverable to date, when the field is fully developed this may increase considerably.
Project 2- Undeveloped discovery, well tested 3,200 BOPD 27.8 API from the Albian limestone at 3,000 meters.
Iran
 
Project 1- Offshore undeveloped oil field with a minimum proven reserve of 1 Billion Barrels in 32 meters of water. Well tested 625 BOPD 15 API  from formation 590 meters.
 
Project 2- Onshore undeveloped oil field with a minimum proven reserve of 1 Billion Barrels 38 API and 100 BCF. initial output capacity of 3000 bo/d and this is expected to rise to 7,500 bo/d after full implementation of a field development project.
 
Project 3- Offshore undeveloped oil and gas field with a minimum proven reserve of 500 MMBO & 350 BCF in 25 meters of water. Well tested a combined rate of 2,300 BOPD  & 2,100 MCFPD  from formation 3600 meters.
 
Project 4- Onshore undeveloped oil and gas field with a minimum proven reserve of 2 Billion Barrels and 400 BCF. Asymetrical anticline elongated NW-SE, with the NE and SW flanks dipping 10 to 40` and 40 to 70` respectively.
 
Project 5- Onshore undeveloped oil and gas field with a minimum proven reserve of 500 MMBO & 100 BCF. Anticline elongated NE-SW, which is oblique to the Zagros trend.

Iraq
 
Project 1-Undeveloped oil and gas discovery with 4 TCF & 300 MMBO and 10 MMBC in place. 5 productive wells completed in two reservoirs at 2,100 & 2,320 meters.
 
Project 2-Undeveloped oil discovery with 1.35 Billion barrels in place. 3 productive wells completed in two reservoirs at 2,003 & 2,531 meters. First zone tested 5,600 BOPD 21.7 API.
 

Kurdish Regional Government - Undeveloped Discoveries

                                                                        Oil in Place     Recoverable    Gas

                                                                         (MMBO)                                        (pp MMSCF)

Appraising

Zagros Fold Belt (Zagros Province)

450

150

75000

Appraising

Zagros Fold Belt (Zagros Province)

420

140

42000

Discovery

Zagros Fold Belt (Zagros Province)

 

112

720000

Discovery

Zagros Fold Belt (Zagros Province)

300

100

 

Appraising

Zagros Fold Belt (Zagros Province)

 

100

280000

Appraising

Zagros Fold Belt (Zagros Province)

 

80

 

Discovery

Zagros Fold Belt (Zagros Province)

 

70

 

Discovery

Zagros Fold Belt (Zagros Province)

 

50

 

Discovery

Zagros Fold Belt (Zagros Province)

250

50

 

Temporarily shut-in

Zagros Fold Belt (Zagros Province)

400

40

40000

Appraising

Zagros Fold Belt (Zagros Province)

 

40

5000

Appraising

Zagros Fold Belt (Zagros Province)

 

40

 

Discovery

Zagros Fold Belt (Zagros Province)

 

35

 

Discovery

Zagros Fold Belt (Zagros Province)

 

30

 

Discovery

Zagros Fold Belt (Zagros Province)

 

30

30000

Discovery

Zagros Fold Belt (Zagros Province)

 

30

 

Discovery

Zagros Fold Belt (Zagros Province)

 

25

 

Discovery

Zagros Fold Belt (Zagros Province)

 

20

25000

Discovery

Zagros Fold Belt (Zagros Province)

 

15

 

Discovery

Zagros Fold Belt (Zagros Province)

 

10

 

Discovery

Zagros Fold Belt (Zagros Province)

 

10

 

Temporarily shut-in

Zagros Fold Belt (Zagros Province)

 

 

1800000

 

Dubai

 
Onshore undeveloped gas discovery with 250 BCF and 15 MMBC in place. 1 productive wells completed in reservoir at 4,254 meters, testing 14,000 MCFPD & 150 BCPD.

Turkey
 
Project 1- Onshore -Project 1- Undeveloped discovery that tested 2,000 BOPD, 33 gravity from Bedinan Formation at 7,700 feet, no appraisal wells drilled.
 
Project 2- Onshore - Project 2 – Two Gas discoveries on same block that could be part of one development project   Thrace-Gallipoli Basin, estimated proven reserves for one field is 9,000 MMSCF and the other is 3,000 MMSCF, however field limits not established. Second Gas discovery with one successful appraisal well with 3 BCF in proven recoverable reserves with the discovery well testing 1 MMCPD from a reservoir at 1100.m.
 
UAE
 
 
Onshore shut-in field, twos well capable of producting 350 MCFPD and 100 BCPD.